Commissioning Steps Standard Installation Procedure: a. Connect battery terminals first b. Close battery circuit breaker c. Verify battery terminal voltage (>10.5V DC for 24V systems / >21V DC for) d. Connect photovoltaic array input e. Close PV circuit breaker f. Confirm display activation and charging status indication g. Press power button (right side) to switch to "1" (ON position) h. Measure stable 230V AC output voltage i. Connect utility grid input j. Close utility circuit breaker k. Wait 2 minutes for system stabilization l. Close output distribution circuit breaker Critical Operational Protocol: WARNING: Incorrect installation sequence may cause irreversible damage to the inverter.